We are excited to present you one of our larger made-to-measure projects. To produce 120,000 bottles of Gin or quadruple their Whiskey production, our customer needed 6,000 litres per hour of treated water. Entering the plant, the city water is first treated by a Clack carbon system, followed by a Clack duplex softener and supplied as permeate for the Herco reverse osmosis unit. In order to not interfere with area of local beauty, storage tanks had to be installed underground. Due to space constraints and the plant having to be installed in different areas, the water needed to be boosted overhead for 100 meters. The plant is tested fortnightly and every six months we carry out a maintenance service, this keeps our customer happy and allows them to continue producing at maximum capacity.